All modules

Module 02 - Manufacturing

A change on this order should not rewrite the next one.

Most stock systems assume you build the same thing repeatedly. If you build to order, the interesting part is the deviation: the customer change on hull 47 that must not propagate to hull 48. DKayMRP is built around that distinction rather than apologising for it.

01Bills of materials

A blueprint, and a copy per order

The blueprint BOM is the design as it stands. When an order is confirmed it takes its own copy, and from that point the two are separate. Engineering keeps improving the blueprint; the order in build keeps the parts it was quoted on.

  • Blueprint BOM and per-order copy
  • Revision history on both
  • Multi-level assemblies
  • Change orders recorded, not overwritten

02Work orders

Put the plan on the floor

Demand becomes executable work orders with their materials, their sequence and the station they belong to. Operators see the job in front of them and the components it needs, without a paper traveller going soft in someone's back pocket.

  • Work orders and routing
  • Operation sequence per station
  • Material requirements per operation
  • Status visible without asking anyone

03Execution

Consumption recorded where it happens

Material issued to a job leaves the shelf in the same step it joins the order, and labour is booked against the operation it was spent on. Both are movements in the same ledger inventory already uses, which is what makes the costing add up later.

  • Material issue against the work order
  • Labour capture per operation
  • Scrap and rework recorded as events
  • Quality checks at the operation

04Costing

What the job actually cost

Materials consumed, labour booked and the change orders in between roll up into the cost of that specific order. The expensive part of engineer-to-order work is the change, so the change is where the costing starts rather than an adjustment bolted on at the end.

  • Job costing per order
  • Cost of a change order, isolated
  • Work in progress valuation
  • Estimate against actual, per job

From a confirmed order to a finished build

01

The order takes its copy

Confirmation copies the blueprint BOM onto the order. Later design changes do not reach back into a build already underway.

02

Work orders are raised

The copy explodes into work orders, operations and the material each one needs, sequenced by station.

03

The floor consumes

Material is issued and labour is booked against the operation, both landing in the same ledger as every other movement.

04

The job is costed

Materials, labour and every change order roll up into what this build cost, next to what it was quoted at.

Your factory has a rhythm. Let us find it.

See what changes when the whole operation is in sync.